Industrial Installation

Customer:

German industrial equipment manufacturer and system supplier of intelligent machine and line concepts for the production of web products such as wallpaper, floor coverings, film/foils and technical textiles.

 

Project:

Installation of production line for PVC-expanded leather in Changzhou.

 

Date:

Jun to Sep 2015

 

Scope of work:

  • Unloading and move-in of all delivered machinery
  • Unpacking and disposal of waste packing material
  • Positioning of all components according to the layout
  • Erection and installation of the steel platform
  • Detailed mechanical assembly
  • Installation of air ducts
  • Installation of cable trays and ducts, cable pulling
  • Connection of cables
  • Delivery and installation of piping systems for:
    • compressed air
    • cooling water (incl. Armaflex insulation)
    • steam (insulation with Rockwool and gal. metal sheet), incl. x-ray test and documentation

 

Scope of supply:

  • Approx. 6500 hours of mechanical and electrical works
  • Divers forklifts, mobile cranes, working platforms
  • Fully equipped tool container, other tools
  • All materials for the piping systems, incl. installation materials and consumables

 

Remarks:

The second production line in Zhangjiagang was contracted with SINOSERV as well and successfully installed until February 2016